About McGeoch

194 years from ship chandler to naval power engineering

Every milestone below sits deeper than the last. Scroll down and the light goes with you — from a Glasgow chandlery in 1832 to sole-source supply on the Royal Navy’s next generation of submarines.

1832 — 1889

01 Foundations

Brass, castings and lamps for the Clyde — the trade that put McGeoch on the water.

1832

Origins in Glasgow

Founded by William McGeoch, brass founder and marine ship chandler. Castings, fittings and lamps for the Clyde — the trade the company still recognises itself in, nearly two centuries on.

1887–1889

Marine electrical manufacturing established

Birmingham manufacturing at scale, including the RMS Titanic fit-out. The move from founding brass to wiring ships is the one the company has been repeating, in new technologies, ever since.

1996 — 2008

02 Reinvention

New ownership, power engineering, and the first submarine programmes.

1996

Current ownership era begins

Acquires RTL; consolidates in Birmingham.

1999

Move into power engineering

Acquires William White Switchgear.

2000

Renamed MTL

McGeoch RTL Ltd becomes McGeoch Technology.

McGeoch Technology
2002

Enters UK submarine programmes

Astute-class: panels, lighting, junction boxes. The point at which the company stops supplying ships and starts supplying submarines.

2003

Surface fleet entry

First surface win, Type 45 lighting across six ships. Submarine discipline applied to a destroyer programme.

2004

Lighting range extended

Acquires Westair, broadening the naval lighting portfolio.

2008

Aircraft carrier programme

QEC carriers: lighting, junction boxes, distribution panels. The largest warships ever built for the Royal Navy.

2014 — Present

03 Next Generation

Vertical integration and sole-source supply on the deterrent's next generation.

2014

Vertically integrated supplier

All capability in-house, with increased space and added fabrication and machining. Design, build and support under one roof.

2021

Dreadnought enters manufacture

Boat 1 in build; sole-source. The deterrent's next generation carries McGeoch electrical and lighting from the first compartment onward.

2024

Next-generation submarine electrical & lighting

DDQ packages on Dreadnought.

2025

Warship lighting system

DALI system fitted to a warship.

194